Installation
20 900-0113-01-00 Rev A
Mounting Surface
M8 x 1.25 Stud
Lock Washer
Battery
Cable Lug
13 mm Nut
Flat Washe
r
Insulator
Install battery cable lug, nuts and washers in the
order illustra
ted.
he battery cable lug should be the
first item installed on the stud. It should make solid
contact with the mounting surface. Do not install
hardware in a different order than shown.
Figure 9 Required Order of Battery Cable Hardware
CAUTION: Fire Hazard
Never install extra washers or hardware between the mounting surface and the
battery cable lug. The decreased surface area can build up heat.